{"id":44,"date":"2010-12-01T15:58:52","date_gmt":"2010-12-01T15:58:52","guid":{"rendered":"http:\/\/mvs102-004.directrouter.co.uk\/~collplac\/?page_id=44"},"modified":"2011-03-02T19:15:23","modified_gmt":"2011-03-02T19:15:23","slug":"asbestos-removal","status":"publish","type":"page","link":"http:\/\/www.redroaddemolition.co.uk\/?page_id=44","title":{"rendered":"Asbestos Removal"},"content":{"rendered":"<p>Before any works can begin, a thorough asbestos survey is carried out. Samples of materials are taken from various locations within the buildings to determine the quantity and type of asbestos materials present.<\/p>\n<p><a rel=\"attachment wp-att-168\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=168\"><img loading=\"lazy\" class=\"alignnone size-thumbnail wp-image-168\" title=\"Asbestos Survey.1\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Asbestos-Survey.1-150x150.jpg\" alt=\"Asbestos Survey.1\" width=\"150\" height=\"150\" \/><\/a><a rel=\"attachment wp-att-169\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=169\"><img loading=\"lazy\" class=\"alignnone size-thumbnail wp-image-169\" title=\"Asbestos Survey.2\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Asbestos-Survey.2-150x150.jpg\" alt=\"Asbestos Survey.2\" width=\"150\" height=\"150\" \/><\/a><a rel=\"attachment wp-att-170\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=170\"><img loading=\"lazy\" class=\"alignnone size-thumbnail wp-image-170\" title=\"Asbestos Survey.3\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Asbestos-Survey.3-150x150.jpg\" alt=\"Asbestos Survey.3\" width=\"150\" height=\"150\" \/><\/a><a rel=\"attachment wp-att-171\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=171\"><img loading=\"lazy\" class=\"alignnone size-thumbnail wp-image-171\" title=\"Asbestos Sampling\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Asbestos-Sampling-150x150.jpg\" alt=\"Asbestos Sampling\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>This survey is essential so that safe methods of working can be developed when removing the asbestos materials. The asbestos materials inside and outside the buildings will be removed in strict accordance with the Asbestos at Work Regulations and under notification to the Health and Safety Executive (HSE). Mast climbers will be used to remove all external asbestos materials. All asbestos containing materials are safely removed from site and taken to a secure licenced waste facility for disposal.<\/p>\n<p><a rel=\"attachment wp-att-178\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=178\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-178\" title=\"Mast Climber On Gable\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Mast-Climber-On-Gable-320x207.jpg\" alt=\"Mast Climber On Gable\" width=\"320\" height=\"207\" srcset=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Mast-Climber-On-Gable-320x207.jpg 320w, http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Mast-Climber-On-Gable.jpg 640w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/a><a rel=\"attachment wp-att-179\" href=\"http:\/\/www.redroaddemolition.co.uk\/?attachment_id=179\"><img loading=\"lazy\" class=\"alignright size-thumbnail wp-image-179\" title=\"Mast Climbers South and East sides\" src=\"http:\/\/www.redroaddemolition.co.uk\/wp-content\/uploads\/2010\/12\/Mast-Climbers-South-and-East-sides-150x150.jpg\" alt=\"Mast Climbers South and East sides\" width=\"150\" height=\"150\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before any works can begin, a thorough asbestos survey is carried out. Samples of materials are taken from various locations within the buildings to determine the quantity and type of asbestos materials present. This survey is essential so that safe &hellip; <a href=\"http:\/\/www.redroaddemolition.co.uk\/?page_id=44\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":22,"menu_order":1,"comment_status":"closed","ping_status":"open","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/44"}],"collection":[{"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44"}],"version-history":[{"count":17,"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/44\/revisions"}],"predecessor-version":[{"id":159,"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/44\/revisions\/159"}],"up":[{"embeddable":true,"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/22"}],"wp:attachment":[{"href":"http:\/\/www.redroaddemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}